Sellafield BEP In-cell Handlers and 60t PHC
The Sellafield Box Encapsulation Plant (BEP) In-cell handlers and 60t Package Handling Crane (PHC) refurbishment project commenced in 2015. The project entailed the refurbishment of:
- 60t PHC, including a 10t maintenance Aux Hoist
- n 10t Box Operation Cell Handler Crane
- n 5t Long Wheelbase (LWB) Waste Treatment Cell (WTC) Handler (uprated to 10 tonne)
- n 2t Short Wheelbase Waste Treatment Cell Handler (uprated to 10 tonne)
Click here to read the full case study.