Pump Repair Process

Collection

Our transport will collect the pump from site and return to our workshop facility.

Booking In

The pump is ‘Booked In’ by our stores staff, and allocated a Contract Number by our office staff.

Cleaning & Stripping

The pump is cleaned externally and then disassembled in our ‘Stripping’ area inside our workshop.

Inspection & Quotation

The pump is then inspected by our Engineers, measurements are taken and a detailed quote with digital images is issued to the customer.

Customer Go-Ahead

Upon acceptance from the customer, the pump is then cleaned internally. Necessary parts for the repair are ordered.

Coatings

If a coating is required, the pump machined faces are masked off, shot blasted and prepared
for the performance coating see photos.

Machining

Raw material is ordered and sent into our machine shop, where it is machined to our manufacturing drawings, to ensure components have the necessary internal tolerances required within the pump.

Assembly

The pump is built by our time served fitters in our assembly area.

Performance Testing

The pump is performance tested in our test area. Figures taken and a test curve produced.

Painting

Once tested and the certificate is signed off by management, the pump is painted.

Final Inspection & Quality Control

The unit then has an Identification Plate riveted to its case and the unit undergoes ‘Final Inspection’ by our team leader.

Transport

The Pump is delivered back to the customer’s site.

Installation

If required, our qualified / safety passport personnel can install the unit at the customer’s site/plant.